232601-2-164-2006 200 NE MOE ST
Address:
200 NE MOE ST
POULSBO,  WA  98370
Status: Active
Zone:
Sec/Twn/Rng: 23261E
Quarter: NW
Neighborhood:
Subdivision:
Owner:
CITY OF POULSBO
200 NE MOE STREET
POULSBO,  WA  98370-7347
Applications:
Pending: 8
Issued: 0
Closed: 17
Legal Description: COMMENCING AT THE NORTHEAST CORNER OF GOVERNMENT LOT 4, SECTION 23, TOWNSHIP 26 NORTH, RANGE 1 EAST, W.M., IN KITSAP COUNTY, WASHINGTON; THENCE SOUTH 635 FEET; THENCE WEST 355 FEET TO THE TRUE POINT OF BEGINNING; THENCE CONTINUING WEST 132 FT; THENCE NORTH 143 FEET; THENCE EAST 132 FEET; THENCE SOUTH 143 FEET TO THE TRUE POINT OF BEGINNING.

Details
PROCESS NO: 1342856
SCHOOL DISTRICT: 400
ROAD SERVICE AREA: 1
PORT DISTRICT: PORT OF POULSBO
FIRE DISTRICT: FIRE DIST NO 18
PUD: PUBLIC UTILITY DIST NO 1
CITY: CITY OF POULSBO
GMA JURISDICTION: City of Poulsbo

Assessed Value
Year Taxable Assessed Value Class Tax Code Tax Status
2019 $0.00 670 0415 T
2018 $0.00 670 0415 T
2017 $0.00 670 0415 T

Applications
Comprehensive Plan Amendment
Application is under initial review
Submitted: 11/15/2019
Issued:  
Closed:  
Project Description
2020 Comp Plan Amendment - Parks
 

Comprehensive Plan Amendment
Technically complete
Submitted: 11/15/2019
Issued:  
Closed:  
Project Description
2020 Comp Plan Amendment - Centers
 

Comprehensive Plan Amendment
Technically complete
Submitted: 11/15/2019
Issued:  
Closed:  
Project Description
2020 Comp Plan Amendment - CIP
 

Sepa Checklist
Closed
Submitted: 8/21/2019
Issued:  
Closed: 12/2/2019
Project Description
SEPA Review for transfer of jurisdiction for Class IV Forest Practices
 

Shoreline Exemption
Approved
Submitted: 8/9/2019
Issued:  
Closed:  
Project Description
Installation of a WQ treatment vault in the curb line at tax id #152601-4-061-2006 will function to treat approximately 7,500 sf-10,000sf of currently untreated roadway runoff. The treated runoff will discharge directly to Liberty Bay via existing storm conveyance. The Front Street WQ Vault will be constructed and installed entirely within the existing pavement section and will have a net increase on water quality entering Liberty Bay. Construction stormwater best management practices will be implemented in accordance with the 2014 Department of Ecology Stormwater Management Manual for Western Washington to minimize any potential stormwater impacts. Construction is scheduled for August to October of 2019.
 

Shoreline Exemption
Approved
Submitted: 8/9/2019
Issued:  
Closed:  
Project Description
The existing swale /roadside ditch located adjacent to tax parcel#232601-3-099-2004 will be reconstructed to restore functionality and will be enhanced with bioretention soil/plantings to improve and treat runoff before discharging to Liberty Bay. All construction work will take place within the existing right of way and will have a net increase on water quality entering Liberty Bay. Construction stormwater best management practices will be implemented in accordance with the 2014 Department of Ecology Stormwater Management Manual for Western Washington to minimize any potential stormwater impacts. Construction is scheduled for August to October of 2019.
 

Sepa Checklist
Closed
Submitted: 4/11/2019
Issued:  
Closed: 5/22/2019
Project Description
2020-2025 TIP - SEPA
 

Miscellaneous
Project Clock Stopped and Project On Hold
Submitted: 4/9/2019
Issued:  
Closed:  
Project Description
2019 Construction Standards Update
 

Preliminary Application
Withdrawn
Submitted: 2/21/2019
Issued:  
Closed:  
Project Description
Preliminary Application Meeting for Ross Residential Infill Project
 

Critical Area Permit
Approved
Submitted: 1/14/2019
Issued:  
Closed:  
Project Description
Improvements to Finn Hill for shared use path from Olhava Way to Vinland Elementary School. This proposal impacts a wetland and requires a Critical Area Permit (CAP)
 

Comprehensive Plan Amendment
Closed
Submitted: 11/15/2018
Issued:  
Closed: 7/9/2019
Project Description
2019 CPA: Adjustments of funding sources estimated in Chapter 12.
 

Comprehensive Plan Amendment
Closed
Submitted: 11/13/2018
Issued:  
Closed: 9/3/2019
Project Description
2019 CPA: Site Specific to change from RL to Park
 

Comprehensive Plan Amendment
Closed
Submitted: 11/13/2018
Issued:  
Closed: 8/30/2019
Project Description
2019 CPA: Update to Table CFP-4, the 6-year CIP
 

Critical Area Permit
Closed
Submitted: 11/9/2018
Issued:  
Closed: 9/12/2019
Project Description
The overall project will improve the Noll Road Corridor between State Route 305 (SR305) and Lincoln Road. The project will include roadway, sidewalk, bike lane and shared use path improvements in various configurations through the corridor. The project will realign Noll Road from 1/4 mile south of Poulsbo Elementary School to SR305 (New Johnson Parkway roadway) along with fish passage barrier culvert replacement at Bjorgen Creek. It will also include intersection improvements (roundabout) at the new Johnson Parkway-SR305 intersection at existing Johnson Road. To the north, the project will include roadway improvements connecting Noll Road to Lincoln Road via Languanet/Maranatha roads. Other project elements include construction of utilities such as stormwater drainage systems, water, and sewer; electrical service for street lighting; and minor relocations of existing power lines. The project will be completed in three phases: Phase 1-SR305 to the intersection of Noll Road and Storhoff Lane. Phase 1 will include intersection improvements at SR305 and Johnson Road and construction of new Johnson Parkway roadway between SR305 and Noll Road. Phase 2-Noll road from the Noll Road-Storhoff Lane intersection to Mesford Street. Phase 2 will include intersection improvements at Poulsbo Elementary School, Hostmark Street and Mesford Street, as well as roadway and non-motorized improvements on Noll Road. Phase 3-Languanet Lane and Marantha Lane from Mesford Street to Lincoln Road. Phase 3 will include construction of roadway and non-motorized improvements on both Languanet Lane and Maranatha Lane. The new roadway improvements on SR305, Noll Road and Johnson Parkway are part of City and state transportation improvement plans that are necessary to reduce congestion, improve safety and provide multi-modal transportation options for the north Kitsap region. Phase 1 of this project is being implemented by the City of Poulsbo in coordination with WSDOT. Phase 2 and 3 of the project will be implemented by the City. When completed the corridor will be approximately 2.15 miles long. Of this total length, 70% (approximately 1.52 miles) will be improvement of existing Noll Road, and 30% (approximately 0.63 miles) will be improvement to other roads and new roadway alignment. The project will incorporate treatment facilities for stormwater quality and quantity, will be located in the right-of-way. In the Phase 1 south segment where wetlands and streams are present, the project will construct a new arterial road, sidewalk and shared use path (SUP). The new arterial alignment (Johnson Parkway) follows the existing Storhoff Lane and Johnson Road alignment, as well as an existing Puget Sound Energy (PSE) utility corridor. The new road alignment was established as part of the 2008 Noll Road Corridor Plan and follows the alignment of a former County Road. The alignment has been subsequently refined to avoid and minimize impacts to wetlands, streams and buffers. Refer to section B.2.3 and the project Mitigation Plan and Habitat Management Plan for additional discussion of mitigation sequencing and impact avoidance.
 

Comprehensive Plan Amendment
Closed
Submitted: 11/9/2018
Issued:  
Closed: 9/3/2019
Project Description
2019 CPA: Urban Paths of Poulsbo Update
 

Comprehensive Plan Amendment
Closed
Submitted: 11/9/2018
Issued:  
Closed: 9/3/2019
Project Description
2019 CPA: Rrecommended changes to the Parks Capital Facilities Program.
 

Preliminary Application
Withdrawn
Submitted: 9/17/2018
Issued:  
Closed:  
Project Description
The Johnson Parkway Road Improvements project is the first phase of the City’s Noll Road Corridor Improvements project which will improve approximately 2.2 miles of the Noll Road corridor between State Route 305 (SR305) and Lincoln Road in the City of Poulsbo. The project will include roadway, sidewalk, bike lane and shared use path improvements in various configurations through the corridor. Refer to attached figures for project location. The Noll Road Corridor project will be constructed in three phases: Phase 1 – SR305 to the intersection of Noll Road and Storhoff Lane. Phase I will include intersection improvements at SR305 and Johnson Road, acquisition of right-of-way and construction of a new roadway between SR305 and Noll Road, and reconstruction of the stormwater system and outfall between SR305 and Liberty Bay. Phase 2 – Noll Road-Storhoff Lane intersection to Mesford Street. Phase II will include intersection improvements at Poulsbo Elementary School, Hostmark Street and Mesford Street, as well as roadway and non-motorized improvements on Noll Road. Phase 3 – Langaunet Lane and Maranatha Lane from Mesford Street to Lincoln Road. Phase III will include acquisition of right-of-way and construction of a new roadway and non-motorized improvements on both Langaunet Lane and Maranatha Lane. This pre-application is for Phase 1 of the project, which is referred to as the Johnson Parkway project. The estimated construction schedule for this phase s 2019-2021. JOHNSON PARKWAY WETLAND AND STREAM IMPACTS AND MITIGATION The new Johnson Parkway roadway will cross wetlands, Bjorgen Creek and tributaries to Bjorgen Creek.
Notes
Information is needed to complete a Case Step
Information provided in Pre-Application Packet was deficient. Additional information was required. A meeting was held in lieu of a Pre-App to discuss what PED needed for review. One or two more check-in meetings will be scheduled. Pre-App may be rescheduled or waived based on results.
 

Sepa Checklist
Closed
Submitted: 4/25/2018
Issued:  
Closed: 8/13/2018
Project Description
2019-2024 Six-Year Transportation Improvement Program
 

Accessory Dwelling Unit
Permit Expired
Submitted: 3/14/2018
Issued:  
Closed:  
Project Description
Helen house
 

Single Family Plumbing
Withdrawn
Submitted: 12/1/2017
Issued:  
Closed:  
Project Description
New plumbing fixtures
 

Single Family Mechanical
Withdrawn
Submitted: 12/1/2017
Issued:  
Closed:  
Project Description
Hot Water Boiler and Groundwater In Source Heating System for swimming pool
 

Single Family Addition
Withdrawn
Submitted: 12/1/2017
Issued:  
Closed:  
Project Description
adding 280 square feet master bedroom/bathroom
 

Single Family Irrigation
Withdrawn
Submitted: 12/1/2017
Issued:  
Closed:  
Project Description
ADDING IRRIGATION
 

Comprehensive Plan Amendment
Closed
Submitted: 11/15/2017
Issued:  
Closed: 5/4/2018
Project Description
Update to Chapter 4 of the Comprehensive Plan.
 

Comprehensive Plan Amendment
Closed
Submitted: 11/15/2017
Issued:  
Closed: 5/4/2018
Project Description
Revise and amend text to reflect new Solid Waste Utility Plan and include it in the CFP as a new funtional plan
 

Comprehensive Plan Amendment
Closed
Submitted: 10/30/2017
Issued:  
Closed: 5/4/2018
Project Description
Text/Map Application for Comprehensive Plan Amendment
 

Comprehensive Plan Amendment
Closed
Submitted: 10/30/2017
Issued:  
Closed: 5/4/2018
Project Description
Text/Map Application for Comprehensive Plan Amendment for CIP
 

Commercial Addition
Withdrawn
Submitted: 5/2/2017
Issued:  
Closed:  
Project Description
 

Sepa Checklist
Closed
Submitted: 4/25/2017
Issued:  
Closed: 12/21/2017
Project Description
SEPA Review for 2018-2023 TIP
 

Preliminary Application
Permit Expired
Submitted: 4/14/2017
Issued:  
Closed:  
Project Description
 

Clearing and Grading
Withdrawn
Submitted: 4/4/2017
Issued:  
Closed:  
Project Description
 

Clearing and Grading
Withdrawn
Submitted: 4/3/2017
Issued:  
Closed:  
Project Description
 

Testing For Portal Payments
Application is under initial review
Submitted: 3/28/2017
Issued:  
Closed:  
Project Description
Testing portal
 

Temporary Use Permit
Withdrawn
Submitted: 3/23/2017
Issued:  
Closed:  
Project Description
test
 

Preliminary Application
Closed
Submitted: 1/20/2017
Issued:  
Closed: 7/31/2017
Project Description
Pre-App for Liberty Bay Trail Project
Notes
General remark or comment
Summary Letter
 

Sepa Checklist
Closed
Submitted: 10/6/2016
Issued:  
Closed: 8/22/2018
Project Description
 

Commercial Tenant Improvement/Remodel
Closed
Submitted: 3/8/2016
Issued: 11/16/2016
Closed: 3/2/2017
Project Description
ADDING OFFICE FOR PROSECUTING ATTORNEY IN AREA NEAR POLICE DEPT.