P-05-08-19-01 Planned Residential Development
Address:
19700 CALDART AVE NE
POULSBO,  WA  98370
Parcel #: 132601-3-065-2006
Status: Approved
Submitted: 5/8/2019
Approved: 9/9/2020
Issued:
Closed:
Expires:
Inspections:
Required: 0
Complete: 0
Project: Develop 9.05 acres into 43 single family lot Planned Residential Development (PRD) and Preliminary Plat (PP). Project area is two existing properties with one home on each property. One home will be retained. Improvements include roads with parallel parking, open spaces with recreational amenities, and utility and stormwater facilities. Access is from Caldart Avenue and Halden Glen Court. Improvements along Caldart Avenue are proposed. ,

Contacts
:
CALDART POULSBO LLC
:
CALDART POULSBO LLC
:
TEAM 4 ENGINEERING
:
Cleaver Jr, Ron

Contractors

Details

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
132601-3-003-2001 CALDART POULSBO LLC 19840 CALDART AVE NE
POULSBO,  WA 98370
132601-3-065-2006 CALDART POULSBO LLC 19700 CALDART AVE NE
POULSBO,  WA 98370

Submittals
Disclaimer: This list subject to change upon review of permit and some items may be added or removed.
Submittal Required Received Accepted
Preliminary Plat Application (view notes) Yes 5/13/2019 6/15/2020
Narrative (view notes) Yes 5/13/2019 6/15/2020
Plans (3 Sets) (view notes) Yes 5/13/2019 6/15/2020
Preliminary Landscape Plan (view notes) Yes 5/13/2019 6/15/2020
Tree Survey and Retention Plan (view notes) Yes 5/29/2019 6/15/2020
Open Space and Recreational Amenities Plan (view notes) Yes 5/29/2019 6/15/2020
Site Design and Building Elevations (view notes) Yes 5/13/2019 6/15/2020
State Environmental Policy Act (SEPA) Checklist (view notes) Yes 5/13/2019 6/15/2020
Geotechnical Report (view notes) Yes 5/13/2019 6/15/2020
Habitat Management Plan (view notes) No 10/28/2019 6/15/2020
Preliminary Drainage Report (view notes) Yes 5/13/2019 6/15/2020
Traffic Impact Analysis (view notes) Yes 7/29/2019 6/15/2020
Trip Generation Report (view notes) Yes 7/29/2019 6/15/2020
Transportation Concurrency (view notes) Yes 5/13/2019 6/15/2020
Miscellaneous Information (view notes) No 3/4/2020 6/15/2020

Approval Steps
Follow your application through the approval process.
Step Status Date
Neighborhood Meeting Meeting or Public Hearing Held 5/13/2019
Counter Complete Approved 5/8/2019
Technically Complete Letter Sent 5/30/2019
Technical Staff Distribution Approved 5/30/2019
Notice of Application Issued Issued 6/7/2019
Engineering Department Review Approve with Conditions 6/15/2020
Finance Department Review Approved 8/15/2019
Building Department Review Approved 8/15/2019
Fire Department District 18 Reviewed 5/30/2019
Public Works Department Review Approve with Conditions 6/15/2020
Planning Department Review Approve with Conditions 6/15/2020
SEPA Issued Issued 5/26/2020
Notice of Public Meeting Issued 6/15/2020
Staff Report Issued 6/16/2020
Planning Commission Approved 6/23/2020
Notice of Public Hearing Issued 6/25/2020
Hearing Examiner Meeting or Public Hearing Held 7/10/2020
Hearing Examiner Decision Issued Approve with Conditions 8/31/2020
Notice Of Decision Issued Issued 9/9/2020

Reviews
Start Complete Applicant Response

Fixtures
Fixture Quantity Per Unit Value
Total: $0.00

Valuations
Permits are based on estimated construction value
Valuation Quantity Rate Value
Total: $0.00

Fees
Current fees for your permit are an estimate until the application has been submitted. Final amount due will be calculated upon submission of your completed application.
Fee Amount
Total : $25,217.11

Bonds
Type Number Amount Issued Expires Completed

Inspections
Completed On

Structures
Structure Use Occupancy Type Square Footage

Conditions

Required Permits
Type Requirement For Number Status

Notes

Associations